Ewen Engineering Limited, Sheffield

Ewen Engineering Limited is a private limited company. Registered at Unit 11 Tinsley Industrial Estate, Shepcote Way, Sheffield S9 1TH, this 5 years old business was incorporated on 2020-04-06 and is officially classified as "manufacture of other fabricated metal products n.e.c." (SIC code: 25990).
1 director can be found in the enterprise: Yasar K. (appointed on 06 April 2020).
About
Name: Ewen Engineering Limited
Number: 12547725
Incorporation date: 2020-04-06
End of financial year: 30 April
 
Address: Unit 11 Tinsley Industrial Estate
Shepcote Way
Sheffield
S9 1TH
SIC code: 25990 - Manufacture of other fabricated metal products n.e.c.
Company staff
People with significant control
Corporate Publishing Limited
6 April 2020
Address C/O Incisive Accounting Limited 52 Grosvenor Gardens, Ford Road, London, SW1W 0AU, England
Legal authority Companies Act 2006
Legal form Private Company Limited By Shares
Country registered United Kingdom
Place registered Uk Register Of Companies
Registration number 06188385
Nature of control: 75,01-100% shares
75,01-100% voting rights
right to appoint and remove directors
Financial data
Date of Accounts 2021-04-30 2022-04-30 2023-04-30 2024-04-30
Current Assets - - 100 100
Total Assets Less Current Liabilities - - 100 100
Number Shares Allotted 100 100 - -

The date for Ewen Engineering Limited confirmation statement filing is 2024-04-19. The last one was filed on 2023-04-05. The date for a subsequent statutory accounts filing is 31 January 2024. Previous accounts filing was submitted for the time up until 30 April 2022.

1 person of significant control is listed in the Companies House, a solitary company Corporate Publishing Limited that has over 3/4 of shares, 3/4 to full of voting rights. This corporate PSC can be found at 52 Grosvenor Gardens, Ford Road, SW1W 0AU London.

Company filing
Filter filings by category:
Accounts Address Confirmation statement Gazette Incorporation Persons with significant control
Confirmation statement with updates April 5, 2025
filed on: 16th, April 2025 | confirmation statement
Free Download (4 pages)