In Time Construction Ltd, Wembley

About
Name: In Time Construction Ltd
Number: 11498447
Incorporation date: 2018-08-03
End of financial year: 31 August
 
Address: Alperton House Bridgewater Road
Suite 2b, Floor 3,
Wembley
HA0 1EH
SIC code: 41202 - Construction of domestic buildings
Company staff
People with significant control
Marius B.
3 August 2018
Nature of control: 75,01-100% shares
75,01-100% voting rights
right to appoint and remove directors
Financial data
Date of Accounts 2019-08-31 2020-08-31 2021-08-31
Current Assets 1,190 344 3,000
Total Assets Less Current Liabilities 1,190 344 3,000
Fixed Assets 1,190 - -

In Time Construction Ltd was dissolved on 2023-08-08. In Time Construction was a private limited company that was situated at Alperton House Bridgewater Road, Suite 2B, Floor 3, Wembley, HA0 1EH, UNITED KINGDOM. Its total net worth was estimated to be around 0 pounds, and the fixed assets belonging to the company totalled up to 0 pounds. This company (formally started on 2018-08-03) was run by 1 director.
Director Marius B. who was appointed on 03 August 2018.

The company was officially classified as "construction of domestic buildings" (41202). The most recent confirmation statement was sent on 2021-07-19 and last time the accounts were sent was on 31 August 2022.

Company filing
Filter filings by category:
Accounts Confirmation statement Gazette Incorporation
Final Gazette dissolved via compulsory strike-off
filed on: 8th, August 2023 | gazette
Free Download (1 page)