Todd Construction (u.k) Limited, Basildon
Todd Construction (U.k) Limited is a private limited company. Located at 4 Capricorn Centre, Cranes Farm Road, Basildon SS14 3JJ, the above-mentioned 2 years old firm was incorporated on 2021-06-21 and is categorised as "other construction installation" (SIC: 43290).1 director can be found in this enterprise: Philip T. (appointed on 21 June 2021).
About | |
---|---|
Name: Todd Construction (u.k) Limited | |
Number: 13468265 | |
Incorporation date: 2021-06-21 | |
End of financial year: 30 June |
Address: |
4 Capricorn Centre Cranes Farm Road Basildon SS14 3JJ |
SIC code: |
43290 - Other construction installation |
Nature of control: |
75,01-100% shares 75,01-100% voting rights right to appoint and remove directors |
The due date for Todd Construction (U.k) Limited confirmation statement filing is 2024-07-04. The last confirmation statement was sent on 2023-06-20. The date for a subsequent statutory accounts filing is 31 March 2024. Most recent accounts filing was submitted for the time period up to 30 June 2022.
1 person of significant control is listed in the official register, an only person Philip T. that has over 3/4 of shares, 3/4 to full of voting rights.
Type | Free download | |
---|---|---|
CS01 |
Confirmation statement with no updates 2023-06-20 filed on: 13th, July 2023 | confirmation statement |
Free Download (3 pages) |